GS Developers (A GS Group Company)

pune metro 2nd phase
Home / Blog / Pune Metro 2nd Phase

Pune Metro 2nd Phase

Pune Metro Phase 2 adds key extensions to Line 2 and new Lines 4 and 4A. Line 2B runs 11.63 km from Ramwadi to Wagholi with 11 stations, while Line 2A covers 1.12 km from Vanaz to Chandni Chowk. Line 4 spans 25.52 km from Kharadi to Khadakwasla with 22 stations, and Line 4A adds 6.12 km from Nal Stop to Manikbaug with 6 stations. The total cost hits about Rs 13,484 crore, funded by central and state governments plus loans from banks like EIB.

Ramwadi to Wagholi Metro

This 11.63 km line uses a smart double-decker viaduct over Ahmednagar Road to beat traffic woes. It starts at Ramwadi and ends at Vitthalwadi, passing spots like Viman Nagar and Kharadi Bypass. Stations include Somnath Nagar, Tulaja Bhavani, Ubale Nagar, Upper Kharadi Road, Wagheshwar Temple, Wagholi, Siddharth Nagar, Bakori Phata, and Vitthalwadi. Travel time drops to 22 minutes from Ramwadi to Wagholi, saving up to 38 minutes over road trips.

StationDistance from Previous (km)Metro Time (min)
Ramwadi00 Min
Viman Nagar1.12 Min
Somnath Nagar1.12 Min
Kharadi Bypass1.32.4 min
Tulaja Bhavani1.01.8 Min
Ubale Nagar1.12 Min
Upper Kharadi Road0.91.6 Min
Wagheshwar Temple1.22.2 Min
Wagholi0.71.3 Min
Siddharth Nagar0.71.3 MIin
Bakori Phata1.12 Min
Vitthalwadi1.432.6 Min

Wagholi Metro Station And Updates

Wagholi station serves big housing areas, JSPM colleges, and local homes in East Pune. It sits near the end of Line 2B, making it a key stop for daily commuters and students. This spot fixes old traffic issues on Nagar Road and boosts links to IT parks. and Tenders for Ramwadi-Wagholi construction started in late 2025, with bids opening around January 2026. Work begins in Q1 2026, split into phases: 4.8 km first, then 6.8 km. The line runs atop a new six-lane flyover by MSIDC. The nearby metro station’s closest stations hit Wagholi, Siddharth Nagar, Bakori Phata, and Vitthalwadi on Line 2B. These serve homes, factories, and schools nearby. Viman Nagar and Kharadi Bypass aid IT workers too

Wagholi Metro Completion Date

Full completion targets 2029-2030 for Line 2 extensions like Ramwadi-Wagholi. The 4-5 year build follows tender awards and land fixes. Delays could come from land buys, but tenders move fast now.

Chandani Chowk Pune Metro Station

This Line 2A station links to NH-48 for buses from Mumbai. It adds Kothrud Bus Depot too, with a 580m footbridge for safe walks. The 1.12 km stretch handles hilly land with an elevated viaduct.

Pune Metro Extension Map

Line 2B maps from Ramwadi via Viman Nagar, Kharadi areas, to Wagholi and Vitthalwadi. See details at punemetrorail.org/Line2ab.aspx for routes. Line 4 maps Kharadi through Hadapsar, Swargate to Khadakwasla.

Upcoming Metro Lines in Pune

Lines 4 and 4A lead Phase 2, plus Hadapsar extensions await nods. Network nears 100 km total. Tenders run for designs and builds

Real Estate: Prices are Going Up

The metro has a huge “metro effect” on property.
Wagholi: Experts think property prices here could jump by 20-25% because of the new connectivity.

Rental Income: If you own a flat in Wagholi, you might get better rent (yields of 4.3% – 5.0%) compared to expensive areas like Baner.

Kharadi: Prices here are expected to grow by 11% as it becomes a stronger business hub

Read More

×